On October 22, Liao Jiasheng, Chairman of the Group, held a working meeting with Liu Qiong, Director of the National Energy Conservation Center, at the Group’s headquarters.
On October 17, the handover ceremony for the China-aided Tonga Royal Tomb Periphery Renovation Project—the first royal tomb project aided by China—was held. The project was designed and managed by CQEC.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
On September 18, China Geo-engineering Corporation (CGC) signed a contract with Mozambique’s Water Supply Asset and Investment Fund (FIPAG) for the rehabilitation and expansion of the water supply system in Tofo tourism area of Inhambane Province.
On September 17, the 22nd China-ASEAN Expo and the China-ASEAN Business and Investment Summit opened in Nanning, Guangxi Zhuang Autonomous Region.
From September 8 to 11, at the 8th Central SOE QC Team Achievement Contest, CECEP Solar Energy Technology (Zhenjiang) Co.,
On September 13, the 2025 Seminar on Innovation in Realizing the Value of Ecological Products, co-hosted by CECEP Eco-Product Development Research Center, the People’s Government of Xiangxi Tujia and Miao Autonomous Prefecture and China University of Geosciences (Beijing), was successfully held in Shibadong Village, Huayuan County, Xiangxi Prefecture, Hunan Province.
On September 10, the Climate Finance Forum hosted by Hong Kong Exchanges and Clearing Limited (HKEX) was held at the Hong Kong Conference Hall under the theme “The Road to Net Zero”.
第  7  /  23  页  总条数: 113
Produced By CMS 网站群内容管理系统 publishdate:2025-12-03 11:08:42