On October 17, the handover ceremony for the China-aided Tonga Royal Tomb Periphery Renovation Project—the first royal tomb project aided by China—was held. The project was designed and managed by CQEC.
On September 30, CECEP Wind-power successfully connected its first wind turbine equipped with a 100% domestically developed PLC controller and main control system to the grid at Lvnaobao Wind Farm.
Recently, the high-altitude ultra-high-voltage (UHV) test hall project in Xizang, for which CQEC’s Industrial Institute was responsible for the feasibility study and construction design, was officially put into operation.
On March 17, Liao Jiasheng, Party Secretary and Chairman of CECEP, held a meeting at the headquarters with Ren Xingwen, Full-time Deputy Secretary of the Party Committee and First-level Inspector of the State-owned Assets Supervision and Administration Commission (SASAC) of Sichuan Province.
Recently, the Hong Kong Sustainability Information Disclosure Seminar, jointly organized by Climate Investment and Finance Association (CIFA) and CECEP (Hong Kong) Investment Co., Ltd., concluded successfully in Hong Kong.
On March 5, CECEP Youth League Committee successfully held the 4th Lei Feng Memorial Day event—titled “Energy Conservation, Books for Hope”—at the CECEP headquarters. The event was presented by the Youth League Committee of CECEP Wind-power Corporation.
Recently, the Gansu Provincial Government publicly recognized 34 central enterprises operating in Gansu that have made outstanding contributions to central-local cooperation. CECEP Wind-power Gansu Branch was included in this commendation.
Recently, CECEP Digital Technology Co., Ltd., a subsidiary of CECEP Data Co., Ltd., has fully integrated the DeepSeek large AI model into its intelligent assistant for the ecological environment industry, marking a comprehensive upgrade of the platform.
第  40  /  43  页  总条数: 211
Produced By CMS 网站群内容管理系统 publishdate:2026-06-26 10:35:59